地理科学 ›› 2008, Vol. 28 ›› Issue (4): 496-500.doi: 10.13249/j.cnki.sgs.2008.04.496

• 论文 • 上一篇    下一篇

塔里木河下游断流河道整治引发的生态问题与重建对策分析

赵万羽, 陈亚宁   

  1. 中国科学院新疆生态与地理研究所绿洲生态与荒漠环境重点实验室, 新疆 乌鲁木齐 830011
  • 收稿日期:2007-09-13 修回日期:2007-11-22 出版日期:2008-07-20 发布日期:2008-07-20
  • 作者简介:赵万羽(1965- ),男,甘肃秦安人,副研究员,理学博士,主要研究方向为恢复生态、草地生态。E-mail: wanyuzhao@ms.xjb.ac.cn或wanyuzhao@hotmail.com
  • 基金资助:
    中国科学院知识创新工程重要方向项目(KZCX2-YW-127)、中国科学院知识创新西部行动(KZCX2-XB2-03)、塔里木河下游水土保持生态修复项目(新计项目[2004] 1281号)资助。

Problems and Measures of Ecological Rehabilitation and Reconstruction in Tarim River Basin

ZHAO Wan-Yu, CHEN Ya-Ning   

  1. Key Laboratory of Oasis Ecology and Pesert Environment, Xinjiang Institute of Ecology and Geography, Chinese Academy of Sciences, Urumqi, Xinjiang 830011
  • Received:2007-09-13 Revised:2007-11-22 Online:2008-07-20 Published:2008-07-20

摘要: 长期断流导致塔里木河下游主河道发育受阻,自然生态系统萎缩。河道治理措施保障了主河道输水的顺畅和水文生态的完整性,实现了上下游补偿性生态大转移(生态回归),但却抑制了河道自然发生规律,改变了原生种繁殖更新环境,河道两侧自然生态过程受阻,可持续维持的生命带变窄,人类需借助外力才能实现生态修复。塔里木河下游断流区生态恢复重建需要尊重客观历史,依托区域原有植被自然发生规律,应选择以柽柳灌丛为主要恢复种类,辅助人工引水渠系设施建设、断根萌蘖、人工补植等辅助手段,逐步实现对退化生态系统修复。

Abstract: The long-term lack of water-convey process in the lower reaches of the Tarim River has restrained natural development of main water course and caused serious degradation of the forest ecosystem in the river-bank of desert environment. The engineering reconstruction of the Tarim River carried out conveying of water straightway and maintained the integrality of river water system. It also transferred some ecology effects from the upper reaches to the lower reaches. However, the channel reconstruction brought out some problems. The change of natural flux of the water course has greatly restricted natural process of evolution of plant community in original green corridor of vegetation. To rehabilitate the retrogressive ecosystem in the region, firstly it need to understand the nature process of vegetation evolution, then to choice Tamarix sp. as major species for reclamation in extremely degraded area, and maintained the regeneration of community of desert vegetation and Populus sp. by giving more flooding water from the new building sluice and new channel.

中图分类号: 

  • X171.4