地理科学 ›› 1984, Vol. 4 ›› Issue (2): 151-158.doi: 10.13249/j.cnki.sgs.1984.02.151

• 论文 • 上一篇    下一篇

水口水电站建设与闽江中下游生态环境关系的预测

余泽忠   

  1. 福建师范大学地理系
  • 出版日期:1984-03-20 发布日期:1984-03-20

A PREDICTION ABOUT THE EFFECT OF THE BUILDING OF SHUIKO HYDROPOWER STATION ON THE ECOLOGICAL ENVIRONMENT OF MIDDLE-LOWER REACHES OF THE MIN RIVER

Yu Zezhong   

  1. Fujian Normal University
  • Online:1984-03-20 Published:1984-03-20

摘要: 闽江水口水电站是华东区拟建的最大水电站,装机容量140万千瓦,计划年发电量49亿5千万度。该电站的建设对闽江中下游的生态环境将引起什么样的变化?现就下列几个大家关心的问题进行探讨。

Abstract: If a comprehensive survey of river course of middle-lower reaches of the Min river and the hydrographic characteristics is made,the conclusion that the harmless effect on the ecological environment when a hydropower station is built at Shuikou Can be reached.The reasons are: 1.After the station is completed,most of the minerals and organic matters will still be washed away into the lower reaches during the flood stage since the torrent of the middle reaches will go on flowing downward in great quantities. 2.After the station is completed,the discharge of lower reaches during the low water stage will be increased by the adjustment,so that the movements of tidal current will be as regular as usual and that is more favourable than before for the irrigation and navigation. 8.After the station is completed,the ecological environment will be as same as before both at the mouth of the Min river and beyond it,so there will be no obvious effects on the migration of fishes and the fishing production. The problem of any sudden disappearance of fishes at the fishing ground owing to the shortage of baits will not at all occur. 4.A great quantity of mud and sand will be washed out from the middle reaches beyond the dam so that deposition of silt within the reservoirs must not be very serious.